Sitemap  -  Collection  -  中文版  -  ENGLISH

Hello, welcome to SOC (Jiangsu) Environmental Technology Co.,Ltd. website!

Drive product innovation with design

Committed to building a leading benchmark in the industry

Hotline: +86 153-7183-3337

Your location: Home>>News>>Industry news
Types of sheets in the purification workshop

Publisher: SOC (Jiangsu) Environmental Technology Co.,Ltd. | Hits: 256 | Published on: 2022-8-18 18:01:43 | Close

   Insulation board
   This kind of material is generally prepared from the color steel plate material in the purification workshop, including some rock wool or glass magnesium color steel plate material. The general thickness of the material is about 50, 75, 100 mm. In the selection of the thermal insulation board in the purification workshop, it is also necessary to analyze the fireproof material. The higher the accuracy, the higher the thickness, and the stronger the fireproof ability. , the more expensive the price.


 Aluminum alloy
These materials are generally U-shaped materials, T-shaped ceiling materials, inner and outer circles, angle aluminum and other materials.
Surface material
The surface material of the purification workshop needs to carry out some necessary waterproof requirements, including the temperature requirements for the surface. Generally, the resin material can also be PVC.
lighting
The requirements for indoor lighting in the purification workshop are also important. First, it should not be too dazzling, and secondly, it must be able to see clearly. The auxiliary staff needs to use some reasonable layout requirements, and generally use LED materials. The tightness of the transmission of the wind power material, including some requirements for use, need to operate normally, the cooling requirements and the air supply device need to be interrupted, and the air supply device needs to be turned off.
After selecting the plate type, it is also necessary to design the overall layout structure
The overall layout of the workshop construction is as follows:
1. When entering aseptic construction, it is necessary to open more aisles and build it in the operating space.
2. Distinguish the operating space of the purification workshop from the partition.
3. The interior needs to be UV-sterilized, and the overall distribution needs to be well-proportioned, so that the anti-virus is comprehensive without dead ends.
4. It is necessary to have its own independent experimental table, and the distance between ultraviolet rays, etc. and the table should not exceed 1.5 meters.
5. The space and the place where the operating space is separated need to be connected by two layers of windows.


Previous: Maintenance method of purification workbench

Next: Several prohibitions in the clean room

More

New Arrivals